Alcam Green Future

PROJECT DETAILS

Alcam Green Future

Beneficiary: S.C. ALCAM INTERNATIONAL S.A.
Title: PRODUCTION HALL CONSTRUCTION, STORAGE AND OFFICES, RAW MATERIALS STORAGE, ANNEXES, EXTERIOR ARRANGEMENTS AND UTILITIES
Location:Urziceni Municipality, Ialomita County
Project description:
This project proposes the construction of a new hall, as well as the annex buildings necessary for it, within an existing industrial complex. The buildings have a total built-up area (existing + proposed) of approximately 11,000 sqm.

Client

Alcam Green Future

Location

Urziceni Mun.

Project type

Production Hall Construction

Completion

In progress

Client

Alcam Green Future

Location

Urziceni Mun.

Client

Alcam Green Future

Location

Urziceni Mun.

Client

Alcam Green Future

Location

Urziceni Mun.

Project type

Production Hall Construction

Completion

In progress
The newly proposed hall will be divided into 3 areas: Office area for TESA staff, a production area, and storage area. The office area consists of a ground floor and a first floor, and has a social area outside. In the production area are included all the auxiliary technical rooms necessary for the building to function correctly. The storage area is, in turn, divided into a cargo storage area, and an area for receiving / shipping the goods. Outside, near the hall, is a tent which separates the raw materials needed for the production and acts as a storage room for them. This tent will communicate with the hall through alleys that correspond to the storage area. In addition to this tent, we will propose a platform on which the water tank and a building with the role of pumping station necessary for the fire-fighting installation will be located, as well as the generator for the vital consumers, necessary for the hall.
At the same time, the project includes arrangements for external platforms, parking lots, sidewalks, green areas, a newly proposed retention basin and vertical systematization.
The design specialties involved: architecture, interior and exterior installations, prefabricated reinforced concrete resistance, vertical systematization.
Year / Duration of the project: June 2019 / Present. The project completed but in the process of approval-authorization
Scope of works: design of DTAC / PTH-DE phase, preparation of documentation for approval-authorization, supervision of works execution